EV Charging Overview

Most failed EV projects fail at the incoming supply, not the charge point. Before quoting hardware we assess your existing load, headroom and board capacity, and tell you honestly whether the site supports the number of bays you want.

Where capacity is tight, load management lets several bays share an available supply rather than triggering a costly DNO upgrade. Where an upgrade is genuinely needed, we handle the application rather than leaving it with you.

Installations cover workplace car parks, fleet depots, holiday parks, hotels and residential developments, with back-office options for access control, usage reporting and billing.

02

Charge Point Options

Site and load survey

Incoming supply, existing demand and spare capacity measured before anything is specified.

Charge point supply

Untethered or tethered units from 7.4kW single phase to 22kW three phase.

Groundworks and containment

Trenching, ducting, bollards and surface reinstatement where bays are remote from the building.

Load management

Dynamic balancing so multiple bays share available capacity without tripping the main.

Access and billing

RFID or app access, usage reporting and driver billing for workplace and public bays.

Servicing

Annual inspection, firmware updates and fault support under a maintenance agreement.

Rating
Supply
Typical charge
Best for
7.4 kW
Load-managed array
~30 miles per hour
Homes, all-day workplace parking
11 kW
Three phase
~45 miles per hour
Hotels, holiday parks, long dwell
22 kW
Three phase
~90 miles per hour
Fleet depots, high-turnover bays
Load-managed array
Shared
Varies by demand
Multiple bays on a constrained supply

Real charge rates depend on the vehicle’s on-board charger — many cars cap at 7.4kW or 11kW regardless of the unit fitted.

03

Installation

1

Requirement and survey

Bay count, vehicle types, dwell time and future expansion assessed alongside the electrical supply.

Week 1

2

Design and quotation

Layout drawing, cable routes, load strategy and a fixed price including groundworks.

Week 1–2

3

DNO application

Where extra capacity is needed we submit and manage the application with the network operator.

If required

4

Installation & commissioning

Install, test, commission, register the units and hand over with driver instructions.

1–2 days on site
04

Standards

EV charging installations are covered by BS 7671 Section 722, which sets requirements for protective devices, earthing arrangements (including PEN fault detection) and RCD protection specific to charge points. Workplace installations also fall under the Electricity at Work Regulations for ongoing maintenance.
BS 7671 Section 722
EAWR 1989
IET Code of Practice for EV Charging
05

Why choose Recall

Frequently asked

Can our supply handle more chargers?

That is exactly what the load survey answers. We log demand over a period, compare it against your available capacity and show what can be added with and without load management.

Yes. Where a supply upgrade is needed we prepare and submit the application and manage it through to energisation.

Yes — RFID or app-based access with per-kWh billing and usage reporting, useful for workplaces recovering cost and for hotels offering it as a paid amenity.

An annual electrical inspection, connector and cable checks, and firmware updates. Units left unserviced tend to fail quietly and get discovered by an annoyed driver.

Planning EV bays this year?

Start with the load survey — it decides everything else about the project.